At this point, the roof could be set up — or no less than loaded— ahead of setting up the doorways and windows. This allows the building envelope to settle. Footings are usually wider than the inspiration and sit a person foot beneath the frost line (The everyday depth at https://preecha-concrete-pile05936.izrablog.com/33236898/fascination-about-pile